Removal and maintenance of scaffolding

In recent years, people have paid more and more attention to the topic of “maintenance”. If anything wants to extend its useful life, it is necessary to protect and repair things so that they adhere to normal conditions. At this time, how to do its protection and maintenance work is very necessary. Scaffolding is a very important carrier in the construction. Therefore, doing its protection work is a responsibility for the safety of construction. So how to maintain the scaffolding?
All rods that are tortuous and deformed should be straightened first, and damaged components should be corrected first to ensure that they can be used normally in construction. The scaffolding (including corresponding accessories) in use should be returned to the expenditure library and sorted for storage in time. When stacking in the open air, ensure the flatness of the storage place, excellent drainage, set up support pads and conceal with rags, and accessories and parts should be placed indoors.
In terms of rust removal and anti-rust treatment of parts, anti-rust paint should be applied at least once a year in areas with high humidity (greater than 75%). The fasteners should be oiled, and the bolts should be galvanized to prevent rust. If there is no condition for galvanizing, it should be washed with fire oil after each use, and then coated with engine oil to prevent rust. The small parts such as fasteners, nuts, pads, and bolts used in the disc scaffold are extremely easy to lose. When supporting, the remaining parts should be promptly recovered and stored, and inspected in time when they are withdrawn.
When the scaffold is removed after use, pay attention to the following: When the rack is removed, set up a work area, set up alert signs around it and set up a person to monitor it, and 8 people to direct it to prevent non-operators from entering. Workers at high places who dismantled the shelves put on safety helmets, fastened their seat belts, tied their legs and wore soft-soled shoes.

PREV
NEXT

RELATED POSTS

Become A HB CLOUD Customer

CLOUD—11-year manufacturing expcricncc
11-year manufacturing expcricncc
  • Free samples can be supplied.Customers need to pay for the courier cost, which will be returned in the following orders
  • All your inquires will be reqlied in 2 hours and quotations will be supplied within 24 hours.
  • Once the deposit is received during the contract valid time, pipe will take full responsibility and obligation for accomplishment of the contract.
  • The urgent order with 100% prepament has the priority of delivery.

    Tel:0086

    WhatsApp

    Email:wheelweight9@ssqcpj.com

    Mail to us