Hebei Cloud Import and Export Co., Ltd.

Rosette multi-functional scaffolding

Online Message

Welcome to the online message!
Please fill in your contact information and suggestions! Thank you!

  • PRODUCT DETAIL

Rosette multi-functional scaffolding

Rosette multi-functional scaffolding Rosette multi-functional scaffolding Rosette multi-functional scaffolding Rosette multi-functional scaffolding Rosette multi-functional scaffolding Rosette multi-functional scaffolding Rosette multi-functional scaffolding

Rosette multi-functional scaffolding Rosette multi-functional scaffolding Rosette multi-functional scaffolding Rosette multi-functional scaffolding

Rosette multi-functional scaffolding is the upgrading product for cuplock scafolding. Vertical standards are available in Q345B steel pipe with diameter of φ60mm or 48mm and thickness of 3.2 mm, with rosettes with diameter φ135mm or 122mm and thickness of 10 mm for a maximum of 8 openings which are designed as the connetiole holes for ledgers and diagonal braces.

A rosette wll be welded at every 0.5meters on the vertcal standards, and ledgers are connected whith this novel and beaustiful rosette.There is also a cnnect at the lower part of the standard.The ledger is made from welding a wedge head with pin on both ends of the pipe.

Model Product name Length
LG-3000 3.0m standard 3000
LG-2000 2.0m standard 2000
LG-1500 1.5m standard 1500
LG-1000 1.0m standard 1000
LG-500 0.5m standard 500
LG-350 0.35m standard 350
LG-200 0.2m standard 200
  1. Advanced technology

The disc type connection method is 0 mainstream scaffolding connection mode. The reasonable node design can reach the transmission force of each rod through the node center, mainly used in Europe and America 0 and regions. It is an upgraded product of scaffolding, mature technology and connection. Robust, stable structure, safe and reliable.

  1. Raw material upgrade

The main materials are all low-alloy structural steel (national standard Q345B), the strength is 1.5–2 times higher than that of traditional scaffolding carbon steel pipe (national standard Q235).

  1. Hot-dip galvanizing process

The main components are made of internal and external hot-dip galvanizing anti-corrosion technology, which not only improves the service life of the product, but also provides further guarantee for safety, while at the same time making beautiful and beautiful.

4, Reliable quality

The product starts from the cutting, the whole product processing has to go through 20 to the process, and each step is carried out by special plane to reduce the intervention of human factors, especially the production of crossbars and poles, using self-developed fully automatic welding machine. The products have high precision, strong interchangeability and stable and reliable quality.

5, Large carrying capacity

Taking the 60 series heavy-duty support frame as an example, the allowable bearing capacity of a single pole with a height of 5 meters is 9.5 tons (safety factor 2). The damage load reached 19 tons. It is 2-3 times that of traditional products.

6, Low dosage and light weight

Under normal circumstances, the distance between the poles is 1.5 meters, 1.8 meters, the step of the crossbar is 1.5 meters, the large spacing can reach 3 meters, and the step distance is 2 meters. Therefore, the amount of the same support volume will be reduced by 1/2 compared to the conventional product, and the weight will be reduced by 1/2 to 1/3.

7, Fast assembly, easy to use, save money

Due to the small amount and light weight, the operator can assemble it more conveniently. The cost of detachment, transportation, rental and maintenance will be saved accordingly, under normal circumstances.

 

Become A HB CLOUD Customer

CLOUD—11-year manufacturing expcricncc
11-year manufacturing expcricncc
  • Free samples can be supplied.Customers need to pay for the courier cost, which will be returned in the following orders
  • All your inquires will be reqlied in 2 hours and quotations will be supplied within 24 hours.
  • Once the deposit is received during the contract valid time, pipe will take full responsibility and obligation for accomplishment of the contract.
  • The urgent order with 100% prepament has the priority of delivery.

    Tel:0086

    WhatsApp

    Email:wheelweight9@ssqcpj.com

    Mail to us