Scaffolding calculation in engineering cost business

1. How to calculate the scaffolding when the wall scaffolding is two whitewashed and one whitewashed?
Answer: It is divided into list price and fixed price. If it is fixed price, the masonry height of the wall below 3.6m is calculated according to the scaffold. Double whitewashing, calculate one side of the wall scaffolding and one whitewashing; for single side, only one side of the scaffolding will be calculated (but in some areas, the wall quota has been integrated with the scaffolding height below 3.6m, so it is no longer used). If the height is above 3.6m, it is calculated as a single row of scaffolding, and the single and double sides are the same as above. If it is a list price, you can freely use the quotation of such measures according to the requirements of the bidding documents and the actual situation of the site and the unit’s own ability, that is, freely set the price according to the actual situation.
2. The outer wall double-row scaffolding is set according to the height of the building to take the corresponding height items within the quota, but what height should the frame-beam double-row scaffolding in each layer take?
Answer: Generally speaking, double-row scaffolding is no longer required to be calculated for the frame beams in the floors, but integrated scaffolding should be used. If it exceeds the specified range of the quota, for example, the height of a single floor reaches the upper limit of the quota, etc., then a single row of scaffolding “that is, scaffolding and full house scaffolding” is also counted. Even under special circumstances, double rows can be counted on the fixed floor. In the case of scaffolding, the height of the double-row scaffolding of the frame beam in the floor should also be calculated according to the height of the floor to the top of the frame beam.

PREV
NEXT

RELATED POSTS

Become A HB CLOUD Customer

CLOUD—11-year manufacturing expcricncc
11-year manufacturing expcricncc
  • Free samples can be supplied.Customers need to pay for the courier cost, which will be returned in the following orders
  • All your inquires will be reqlied in 2 hours and quotations will be supplied within 24 hours.
  • Once the deposit is received during the contract valid time, pipe will take full responsibility and obligation for accomplishment of the contract.
  • The urgent order with 100% prepament has the priority of delivery.

    Tel:0086

    WhatsApp

    Email:wheelweight9@ssqcpj.com

    Mail to us