Hebei Cloud Import and Export Co., Ltd.

Scaffolding Swivel Coupler

Online Message

Welcome to the online message!
Please fill in your contact information and suggestions! Thank you!

  • PRODUCT DETAIL

Scaffolding Swivel Coupler

Scaffolding Swivel Coupler Scaffolding Swivel Coupler

Product Manual:

Cross fasteners are also called right-angle fasteners. The products are imported from the United Kingdom, and then they are improved, developed, and designed based on the original National Institute of Construction Mechanization. Manufactured in accordance with the latest national standard GB24910-2010 for steel plate stamping fasteners.

Features:

  1. Strong anti-sliding performance. The sliding resistance of the fastener ensures that the steel pipe and the fastener are in a state of abutting surface with a large bonding area, which overcomes the shortcomings of the point or line of the cast iron fastener and the steel pipe and eliminates the hidden danger of slippage of the steel pipe.
  2. Fasteners have safety advantages, quality advantages, brand advantages, and are safe and labor-saving. Rental income exceeds rental of inferior iron fasteners.
  3. Because the product itself is not easy to rust, not easy to break, no screws are lost, and zero maintenance, which reduces costs and saves time.
  4. Strong rust resistance. The whole piece is treated with double anti-corrosion treatment of galvanization and passivation, its anti-corrosion ability is greatly improved, and its service life is longer than that of cast iron fasteners.
  5. Strong anti-shedding ability. The new type of connection is adopted, and the new screw cap ensures that the fastener can always be vertically and firmly fixed when the steel pipe is deformed, eliminating the possibility of the steel pipe slipping off.

Scaffolding Swivel Coupler Scaffolding Swivel Coupler

Become A HB CLOUD Customer

CLOUD—11-year manufacturing expcricncc
11-year manufacturing expcricncc
  • Free samples can be supplied.Customers need to pay for the courier cost, which will be returned in the following orders
  • All your inquires will be reqlied in 2 hours and quotations will be supplied within 24 hours.
  • Once the deposit is received during the contract valid time, pipe will take full responsibility and obligation for accomplishment of the contract.
  • The urgent order with 100% prepament has the priority of delivery.

    Tel:0086

    WhatsApp

    Email:wheelweight9@ssqcpj.com

    Mail to us