Recently, there have been many accidents such as falling from high places, striking objects, electric shocks, and collapsing of scaffolds in various parts of our country. The scaffolding that carries the safety of workers’ lives has become a “scratch frame”. Therefore, we need to understand in depth how to build a qualified scaffolding, so that is the effective method to ensure the safety of high-altitude workers.

Through the following scaffolding safety management and enhance the skill level of personnel, comprehensively master the knowledge of scaffolding.

1. Preparation before construction
Before the scaffold tower is set up, the construction personnel shall be informed according to the special construction plan.
Proper use of hard hats, safety belts, non-slip shoes, and tool bags.
The scaffolding is composed of: base, vertical pole, horizontal pole, sweeping pole, scissors support, adjustable jacking and scaffolding plate.

2. Classification of scaffolding
According to the support location and support method: it can be divided into floor type, cantilever type, attached lifting scaffold and attached wall hanging scaffold.
3. Types of scaffolding
There is only one row of uprights, and one end of the horizontal horizontal bar rests on the scaffold on the wall.


The height of single-row scaffolding tower should not exceed 24m. Scaffolding composed of two rows of vertical and horizontal poles inside and outside.
The height of the double-row scaffold tower should not exceed 50m; if it exceeds 50m, the section tower should be adopted. Decoration scaffolding: scaffolding used in construction work of decoration engineering
Fourth, the composition and materials of scaffolding
Rotating fastener
Design value of bearing capacity: 8.0KN (about 816 kg)
Right angle fastener
Design value of bearing capacity: 8.0KN (about 816 kg)

PREV
NEXT

RELATED POSTS

Become A HB CLOUD Customer

CLOUD—11-year manufacturing expcricncc
11-year manufacturing expcricncc
  • Free samples can be supplied.Customers need to pay for the courier cost, which will be returned in the following orders
  • All your inquires will be reqlied in 2 hours and quotations will be supplied within 24 hours.
  • Once the deposit is received during the contract valid time, pipe will take full responsibility and obligation for accomplishment of the contract.
  • The urgent order with 100% prepament has the priority of delivery.

    Tel:0086

    WhatsApp

    Email:wheelweight9@ssqcpj.com

    Mail to us