Hebei Cloud Import and Export Co., Ltd.

What are the inspection steps before using the climbing frame?

About our Hebei climbing frame, is to protect the personal safety of our operators, further our project can be carried out smoothly, so we must check all the details before using the climbing frame, so as to ensure our safe construction, so what are the inspection steps before we use the climbing frame?

How to check before using climbing frame

The climbing frame can be lifted by pieces or as a whole. It can be lifted by hydraulic lifting device or electric hoist to meet the requirements of different users. The climbing frame is regular, convenient for inspection and management, and avoids the potential safety hazard caused by the removal of the floor scaffold due to the failure to check the wall bracing. The climbing frame is specially designed and constructed, which can be used repeatedly, and the management is standard, which is easy to meet the requirements of civilized construction. Whether the company takes the road of diversification or specialization, it needs to combine with its own actual situation, and is not affected by the change of building height. The climbing frame solves the problem of unprotected support when the hanging frame meets the balcony, window hole and frame structure.

The climbing frame can save the lifting times of tower crane. After climbing, the bottom of the climbing frame can be backfilled. This height just covers the construction scope of formwork binding reinforcement and formwork support removal during structural construction. The climbing frame avoids the falling object injury caused by repeated erection and dismantling of the cantilever frame and the unsafe hidden danger brought to the erection personnel by the aerial erection. After climbing to the top, the climbing frame can be lowered for decoration, and equipped with anti overturning, anti falling and other safety devices. The lifting operation can be carried out in the frame protection to ensure the construction safety. Roof engineering and decoration engineering can be carried out at the same time. It is not necessary to wait until the roof strength meets the requirements for installation and decoration. The operation specialization improves the construction efficiency, assembly at the lower part and demolition at the lower part, which improves the construction quality and safety.

PREV
NEXT

RELATED POSTS

Become A HB CLOUD Customer

CLOUD—11-year manufacturing expcricncc
11-year manufacturing expcricncc
  • Free samples can be supplied.Customers need to pay for the courier cost, which will be returned in the following orders
  • All your inquires will be reqlied in 2 hours and quotations will be supplied within 24 hours.
  • Once the deposit is received during the contract valid time, pipe will take full responsibility and obligation for accomplishment of the contract.
  • The urgent order with 100% prepament has the priority of delivery.

    Tel:0086

    WhatsApp

    Email:wheelweight9@ssqcpj.com

    Mail to us