Specification for erection of external wall scaffolding
1. The load of the scaffold should not exceed 260kg / m2, and it can only be used after being qualified and listed. It should be checked and maintained frequently during use. Loads exceeding 260kg / m2, or special forms of scaffolding should be designed.
2. Steel pipe columns shall be provided w...






