Hebei Cloud Import and Export Co., Ltd.

Introduction of accessories of coil type scaffold

The coil type scaffold accessories is a kind of scaffold with the buckle plate, joint and bolt as the connecting parts and the excellent steel pipe as the main component. And the use of coil type scaffold accessories in Europe and the United States and other advanced countries and regions has decades of history, it is a safe construction technology products.

1. Large bearing capacity: the coil type scaffold has strong axial shear resistance, and the axial intersection of various members is at one point, and the side connecting members are twice as much as the bowl buckle joint, so the overall stability is good.

2. Strong adaptability: due to the structure and characteristics of the buckle plate, the cross bar can assemble a variety of different angles, which can be applied to the use of buildings with different shapes.

3. Stable and firm: the cross bar plug is closely separated from the vertical bar, the contact surface is large, and the construction is safe. Moreover, the independent wedge-shaped bolt cross self-locking mechanism is adopted, because of the function of interlocking and gravity, even if the bolt is not knocked tightly, the cross bar plug can not be scattered.

4. Quick installation: the installation process of the turnbuckle scaffold is very complicated, and the accessories of the turnbuckle scaffold can only be installed and disassembled with a hammer.

5. Good comprehensive performance: the component series of the coil type scaffold is standardized, the accessories are universal, convenient for transportation and management, no spare parts, low loss, and less investment in the later stage.

PREV
NEXT

RELATED POSTS

Become A HB CLOUD Customer

CLOUD—11-year manufacturing expcricncc
11-year manufacturing expcricncc
  • Free samples can be supplied.Customers need to pay for the courier cost, which will be returned in the following orders
  • All your inquires will be reqlied in 2 hours and quotations will be supplied within 24 hours.
  • Once the deposit is received during the contract valid time, pipe will take full responsibility and obligation for accomplishment of the contract.
  • The urgent order with 100% prepament has the priority of delivery.

    Tel:0086

    WhatsApp

    Email:wheelweight9@ssqcpj.com

    Mail to us