Coil scaffold accessories manufacturers inform maintenance method 3 steps

Main components and accessories of coiled scaffold

1、 The joint consists of a connecting plate welded on the vertical bar, a horizontal bar end buckle joint and a joint.

1 – connecting plate; 2 – bolt; 3 – horizontal bar end buckle joint; 4 – horizontal bar; 5 – inclined rod; 6 – inclined rod end buckle joint; 7 – vertical pole

2、 The outer surface of the bolt shall be consistent with the inner surface of the end buckle joint of the horizontal rod and the inclined rod. The bolt connection shall ensure that the bolt will not pull out after hammering, and the pull-out force shall not be less than 3kn.

3、 The bolt shall be provided with reliable anti pull-out structural measures, and the notched color mark for visual inspection of wedge depth shall be set.

The node spacing of four ‘vertical pole coil buckle should be set according to 0.5m modulus; The length of cross bar should be set according to 0.3m modulus.

How to maintain scaffold accessories

1. First of all, the parts should be inspected. When the parts are removed for inspection, the appearance of the parts should be kept in mind, and the residual amount of the smoothing agent should be confirmed. After sampling the smoothing agent for inspection, the parts should be washed,

As a detergent, gasoline and kerosene are generally used. The scrubbing of the dismantled building fastener is divided into coarse scrubbing and fine scrubbing, which are respectively placed in the container. First, the metal mesh is put on the bottom to prevent the accessories from directly contacting the dirt of the container. Rough washing, if the building fastener with dirt rotation, will damage the rolling surface of the building fastener, should be concerned. In the rough wash oil, use the brush to eliminate the smooth grease and adhesion, and then turn to the fine wash after it is generally clean. Fine washing is to rotate the building fastener in the washing oil and wash it carefully at the same time. In addition, keep the oil clean.

2. In order to infer whether the disassembled accessories can be used, the inspection should be conducted after the building fasteners are washed. Check the shape of raceway surface, rolling surface and mating surface, wear condition of cage, increase of building fastener clearance and damage of irrelevant dimension precision drop. For non wide small ball fastener, use one hand to support the inner ring horizontally and rotate the outer ring to confirm whether it is smooth.

3. Maintenance of parts: in order to make the parts for our use for a long time, we need to maintain and inspect them on weekdays.

PREV
NEXT

RELATED POSTS

Become A HB CLOUD Customer

CLOUD—11-year manufacturing expcricncc
11-year manufacturing expcricncc
  • Free samples can be supplied.Customers need to pay for the courier cost, which will be returned in the following orders
  • All your inquires will be reqlied in 2 hours and quotations will be supplied within 24 hours.
  • Once the deposit is received during the contract valid time, pipe will take full responsibility and obligation for accomplishment of the contract.
  • The urgent order with 100% prepament has the priority of delivery.

    Tel:0086

    WhatsApp

    Email:wheelweight9@ssqcpj.com

    Mail to us